20th September Check In

Desktop5

Linking up with Texas Quilt Gal

My Main Three goals  for the week of September 13th week were:

  • Hand sew down the Scrappy Round the World.Done Good for a baby quilt. I went for Crazy 8’s quilting on it but as it turned out it looks more like Fat 8’s quilting and actually makes it rather cosy, so I can go with that.Scrappy RTW quilt finish
  • Pin another top ready for quilting.Done. As this was actually quite a small quilt about 42″ by 48″ I think, I actually quilted it as well. Now very well I might add, but I did feel like I progressed and finally solved by skipped stitches by lowering the foot. That in itself is a huge relief, I thought it was my speed or something. Pinned Q
  • Sew a border onto a top  of mystery quilt from Edyta Sitar pattern Done and folded away until it has its turn being quilted.Border on M Quilt

Plans for 20th September Week

  • Pin and quilt a small NICU top that is only about 29″ by 35″ which is their requested size.
  • Trim and bind top I quilted in past week.
  • I started  doing the American Patchwork and Quilting Scrappy Quilt Along and have a couple of blocks done and they are having a day long sewing day later In the week via Facebook I think, that I might make the effort to sew a little more on that day. Otherwise this is more a leader and ender exercise.
Advertisement

September To Do

Desktop5

Linking up with Texas Quilt Gal

Plans for Week of 30th of August were

  • Machine sew on binding for Scrappy Round the World quilt. Done.Scrappy RTW binding 
  • Hand stitch the binding on the Log Cabin. Done.Log Cabin doneJPG 
  • Sew some blocks together of a project I am working on – Magnolia, a pattern by Chelsi Stratton.  Done. Sashing Magnolia

Main Three for September 6th

  • Border onto the Magnolia top, which is a 3 inch plain one.
  • Hand sew down the Scrappy Round the World
  • Pin another top ready for quilting.